dehradun Price list of transformer 3150kvaThe foundation of the industry

announcer:hp122HP117294921 release time:2023-12-29 13:13:09

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

dehradun .After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer,dehradun How much is the European box transformer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

The switching power supply lacks one phase of power;

.Power transformer manufacturer

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Power transformer factory


dehradun Price list of transformer 3150kvaThe foundation of the industry



After the test, connect the data signal contact of the automobile relay with the alarm circuit,dehradun Power transformer s13-50, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, and overload is not allowed in the whole process of operation.

Industry management.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.


dehradun Price list of transformer 3150kvaThe foundation of the industry



The noise of dry-type transformer comes from

packing.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Precautions for trial operation of power transformer manufacturers

Dry type transformer manufacturer

dehradun .The power transformer conductor refers to the connecting transmission line between each electromagnetic coil,dehradun Oil immersed transformer 1250, between the electromagnetic coil and the group outlet pipe and between the electromagnetic coil and the tap changer.

Manufacturing process and steps of dry-type transformer

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.