HyderabadTransformer State GridAnalysis of the problems that should be paid attention to in the process of charging

announcer:hp122HP117294921 release time:2023-12-29 10:02:07

Dry type transformer manufacturer

Oil leakage of cast iron parts

Hyderabad.A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger,HyderabadS13-m-200 power transformer, the resistance value exceeds 2m ohm bus.

.Oil leakage of cast iron parts

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness resistance to short-circuit faults, common faults and impact. The work is diligent.

Power transformer manufacturer


HyderabadTransformer State GridAnalysis of the problems that should be paid attention to in the process of charging



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

Protection mode for type selection of dry-type test transformer

Dry type transformer company

technical service.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


HyderabadTransformer State GridAnalysis of the problems that should be paid attention to in the process of charging



The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source,HyderabadDry type transformer of power plant, sampling person, weather conditions and other materials of the oil sample.

Finance Department.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, in some cases transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: 3. The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer 1. Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P,HyderabadBasic structure of power transformer, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Hyderabad.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

For no-load impulse closing of transformer, pay attention to the following matters:

Oil leakage at electric welding position