International Labour OrganizationProtection of oil immersed transformerHow do we choose according to our own needs?

announcer:hp122HP117294921 release time:2023-12-22 12:39:02

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and long-term scalding of iron core will lead to insulation aging.

International Labour Organization.It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss11. As early as the middle and late 1980s, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

.For no-load impulse closing of transformer, pay attention to the following matters:

The key reason for oil leakage is that there are defects in cast iron parts

How much is the power transformer


International Labour OrganizationProtection of oil immersed transformerHow do we choose according to our own needs?



Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing,International Labour OrganizationBox type transformer door, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Maintenance contents of power transformer

Power transformer manufacturer

Job description.After no-load test run is normal for 24h, it can be transferred to on-load operation and the load shall be gradually increased from 25%, 50% and 75% by grade.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, please cut off the input switching power supply.


International Labour OrganizationProtection of oil immersed transformerHow do we choose according to our own needs?



With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding,International Labour Organization4000kva dry type transformer, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding,International Labour OrganizationCooling mode of oil immersed transformer, that is, the disconnection component of the electric field is small.

International Labour Organization.The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.