San RafaelRecycling of old box transformerBring changes to the domestic market

announcer:hp122HP117294921 release time:2023-12-17 09:59:51

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer while the working voltage, and can be solved until power failure.

San Rafael.In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

Oil immersed transformer

.Operation and maintenance management of oil immersed transformer

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal and the transformer will turn to all normal operation.

The hanging core of dry-type transformer is a vital part


San RafaelRecycling of old box transformerBring changes to the domestic market



In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word,San RafaelTemperature measurement of dry-type transformer, if there is any problem at a certain point,San RafaelTransformer electrical test, it will affect the whole power circuit

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

Latest consultation.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.


San RafaelRecycling of old box transformerBring changes to the domestic market



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground,San RafaelProtection grade of oil immersed transformer, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Where is it.Manufacturing process and steps of dry-type transformer

The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

San Rafael.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Operation of oil immersed transformer