NispoliniIntroduction to dry type transformerImprove the effective supply of equipment

announcer:hp122HP117294921 release time:2024-09-12 17:32:04

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Difference between dry-type transformer and oil immersed transformer:

Nispolini.Transformer manufacturer

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

.For no-load impulse closing of transformer, pay attention to the following matters:

Brief introduction of zero line of power transformer

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.


NispoliniIntroduction to dry type transformerImprove the effective supply of equipment



(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Maintenance contents of power transformer

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

discount.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom or it can be replaced by changing the oil.

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, a spacing of more than 2m shall be reserved; If metal fence is selected the metal fence shall be grounded and a warning sign shall be hung at a prominent position.


NispoliniIntroduction to dry type transformerImprove the effective supply of equipment



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

Standard requirements.Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology,NispoliniSpecification of oil immersed transformer, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process,Nispolini80 box type transformer, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

During the operation of the transformer,NispoliniDistribution rectifier transformer, the resistance value of the grounding wire shall be measured accurately every two years.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Nispolini.When the manufacturer of the power transformer samples from the automobile oil tank, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb and loosen your thumb to make the oil enter the pipe,

Power transformer manufacturer

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.