IloviniHow much is a box transformerHow to solve the sinking problem

announcer:hp122HP117294921 release time:2024-09-12 16:38:13

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Oil leakage of heat pipe radiator

Ilovini.Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the system software will automatically terminate the centrifugal fan.

Method and process of taking oil sample of power transformer

.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).


IloviniHow much is a box transformerHow to solve the sinking problem



With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

How to maintain dry-type transformer?

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

index.When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation,IloviniPrice of 500 KVA box type transformer, power off immediately for maintenance.

Note: in the whole process of safety patrol inspection,IloviniBox type transformer, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Due to poor sealing,IloviniHow much is 315 box transformer, generally the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.


IloviniHow much is a box transformerHow to solve the sinking problem



A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Discount.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.

When the full load test is carried out and everything is normal, the load can be connected.

Ilovini.If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%) it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Manufacturing process and steps of dry-type transformer

What is the wavelength of oil immersed transformer?