Rio binarPower supply transformerFatigue strength

announcer:hp122HP117294921 release time:2024-08-23 16:46:23

Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling,Rio binarWarranty period of oil immersed transformer, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding,Rio binarPower transformer installation picture, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

Fault judgment of power transformer

On load commissioning:


Rio binarPower supply transformerFatigue strength



Power transformer manufacturer

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer so it consumes electromagnetic energy.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Quality documents.Connection group structure of dry-type transformer

Analysis of common faults of oil immersed transformer:

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.


Rio binarPower supply transformerFatigue strength



The voltage regulating tap changer is not in place or poor

retailer.Due to careless transportation of the transformer and the thin high-voltage conductor,Rio binarPrice list of 315 KVA box type transformer, the transformer was disconnected by vibration (but there was no grounding device).

Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.

When the full load test is carried out and everything is normal, the load can be connected.

Rio binar.Method and process of taking oil sample of power transformer

When the full load test is carried out and everything is normal the load can be connected.

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.