JesseMulti voltage output transformerHow to choose the operating manufacturer

announcer:hp122HP117294921 release time:2024-06-25 15:47:47

The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.

Wiring mode of dry-type transformer:

Jesse.How is the quality level of dry-type transformer compared with foreign countries?

The voltage regulating tap changer is not in place or poor

.Brief introduction of zero line of power transformer

Oil immersed transformer company

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.


JesseMulti voltage output transformerHow to choose the operating manufacturer



How to reduce the failure of dry-type transformer?

Transformer inspection nose sniffing method

Dry type transformer company

High quality and low price.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Protective measures for damping of dry-type transformer

Oil immersed transformer operation


JesseMulti voltage output transformerHow to choose the operating manufacturer



When the full load test is carried out and everything is normal, the load can be connected.

Welcome calls .Seal oil leakage

The step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change, tap power on and off or short circuit fault, so the dry-type transformer shall be powered off during regulation. Therefore,Jesse4000kva dry type transformer, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating,JessePrice of 100 KVA dry type transformer, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Jesse.(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore,JesseMaintenance standard of dry type transformer, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.