BabahoyoStructure diagram of oil immersed transformerThe following issues should be paid attention to during the construction process

announcer:hp122HP117294921 release time:2024-06-20 12:44:31

BabahoyoInrush current of dry-type transformer, and long-term scalding of iron core will lead to insulation aging.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min and the time interval of each closing shall not be less than 5min.

Babahoyo.Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce airports, tunnel construction, chemical enterprises and factories.

Falling foreign matters and piercing

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area,Babahoyo500KVA price of power transformer, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.


BabahoyoStructure diagram of oil immersed transformerThe following issues should be paid attention to during the construction process



There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

Transformer manufacturer

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Highly recommended.When the full load test is carried out and everything is normal, the load can be connected.

The hanging core of dry-type transformer is a vital part

Difference between dry-type transformer and oil immersed transformer:


BabahoyoStructure diagram of oil immersed transformerThe following issues should be paid attention to during the construction process



Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

Direct material.Loose core screw

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference,BabahoyoPrice of scbh15 series dry type transformer, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Power transformers are used in all walks of life

Babahoyo.On load commissioning:

Dry type transformer manufacturer

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.