San Lorenzo4000kva power transformerHow to identify counterfeit goods

announcer:hp122HP117294921 release time:2024-06-16 15:57:16

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light,San LorenzoHow much is 500KVA box transformer, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

San Lorenzo.When the output power P2 of the transformer is equivalent to the input power P1, the efficiency & ETA; Equivalent, the transformer will not cause loss. But in fact, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

& ldquo; YN, D11 & rdquo; in which 11 indicates that when the working voltage phasor of the primary side line,San LorenzoSpecification for oil immersed transformers, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack and the lifting point shall be on the common earrings or bolts. If necessary, there must be a strong line breaking component the human resources traction belt shall be used as a guide.

In the electric field of the winding to the yoke, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).


San Lorenzo4000kva power transformerHow to identify counterfeit goods



Protective measures for damping of dry-type transformer

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately,San LorenzoBrand of oil immersed transformer, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Dry type transformer

Manufacturing cost.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

Sound in case of phase failure

After no-load test run is normal for 24h, and the load shall be gradually increased from 25%, 50% and 75% by grade.


San Lorenzo4000kva power transformerHow to identify counterfeit goods



Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Installation works.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

San Lorenzo.In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.