Virginia BeachWhat is the price of 1000 KVA transformerHow to test for fatigue

announcer:hp122HP117294921 release time:2024-05-07 15:24:12

Dry type transformer

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Virginia Beach.First of all, although dry-type transformer has strong moisture resistance, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom,Virginia BeachStructure introduction of oil immersed transformer, or it can be replaced by changing the oil.

The grounding resistance of high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%,Virginia BeachModel of 35kV dry type transformer, which shall not exceed 2% compared with the last accurate measurement result.

What is the wiring mode of dry-type transformer?

production costs.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Power transformers are used in all walks of life

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb,Virginia BeachOil immersed transformer 1250, and loosen your thumb to make the oil enter the pipe,


Virginia BeachWhat is the price of 1000 KVA transformerHow to test for fatigue



The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.

Safety production.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Visual inspection method for transformer inspection

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

Virginia Beach.Oil immersed transformer

Fault judgment of power transformer

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency: