KiziltepCode for installation of power transformersTo share with you that problems encountered during the installation process

announcer:hp122HP117294921 release time:2024-04-12 12:31:58

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, such as discoloration, deformation, offset, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

Oil leakage of heat pipe radiator

.It will also produce many faults,KiziltepIntelligent temperature controller for dry type transformer, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side),KiziltepRated current of 400 KVA dry-type transformer, and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Falling foreign matters and piercing


KiziltepCode for installation of power transformersTo share with you that problems encountered during the installation process



The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured,KiziltepParameters of oil immersed power transformer, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Quality improvement.The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

Oil immersed transformer operation

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents power failure, damage to machinery and equipment, etc.


KiziltepCode for installation of power transformersTo share with you that problems encountered during the installation process



In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

plan.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Kiziltep.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.