Chiang MaiPower transformer price: 1000KVAClassification and application

announcer:hp122HP117294921 release time:2024-04-11 10:43:26

How to reduce the failure of dry-type transformer?

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, common faults and impact. The work is diligent.

Chiang Mai.Visual inspection method for transformer inspection

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

.Oil leakage at looper flange

Loose core screw

Oil immersed transformer operation


Chiang MaiPower transformer price: 1000KVAClassification and application



For no-load impulse closing of transformer, pay attention to the following matters:

The efficiency of transformer is closely related to the output power level of transformer. Generally,Chiang MaiRecycling box transformer manufacturer, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.

Then clamp the branch pipe with your thumb,Chiang Mai20 kV Transformer, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

OK or not?.Manufacturing process and steps of dry-type transformer

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.


Chiang MaiPower transformer price: 1000KVAClassification and application



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity while oil transformer has better load working capacity.

Range.Analysis of common faults of oil immersed transformer:

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

When the power transformer operates at full load such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

On load commissioning:

Oil immersed transformer