DaculaWhat is the principle of power transformerDesign method

announcer:hp122HP117294921 release time:2024-04-04 13:43:03

DaculaOutdoor dry-type transformer structure,

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, otherwise it will have an adverse impact on life safety.

Sound in case of phase failure

Dacula.Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration,Dacula2500kVA dry type transformer, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.

Power transformers are used in all walks of life

.For no-load impulse closing of transformer, pay attention to the following matters:

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

Dry type transformer factory


DaculaWhat is the principle of power transformerDesign method



After no-load test run is normal for 24h it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

Difference between dry-type transformer and oil immersed transformer:

Fair price.Noise pollution control and prevention measures of dry-type transformer

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Dry type transformer manufacturer


DaculaWhat is the principle of power transformerDesign method



Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Workshop cost.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Dacula.Solenoid insulation deterioration

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%,DaculaThree phase transformer 380V to 208v, 50% and 75% by grade.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.