The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, and the price factor is also a key factor endangering the popularization and marketing of energy-saving transformers. Although there are energy-saving and convenient subsidy projects to help energy-saving transformers the cost of energy-saving transformers is significantly higher than that of traditional transformers and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

Salto.The person in charge of a transformer manufacturer said that because of the hazards of raw materials and other factors, the market has not yet fully operated.

Oil immersed transformer company

.Fault judgment of power transformer

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

The switching power supply lacks one phase of power;


SaltoMain transformer and distribution transformerHow to solve the sinking problem



If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side,Salto500 KVA oil immersed transformer, and then make the working voltage impulse closing.

manufacturer.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Before application, the sampling container shall be cleaned with vehicle gasoline, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle,SaltoMaintenance standard of dry type transformer, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?


SaltoMain transformer and distribution transformerHow to solve the sinking problem



Analysis of common faults of oil immersed transformer:

Bidding.When we apply oil immersed transformer we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%,SaltoTransformer circuit, 50% and 75% by grade.

Salto.Brief introduction of zero line of power transformer

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation