Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, epoxy resin adhesive shall be used to pour dry-type transformers.

Method and process of taking oil sample of power transformer

.After tightening the loose bolts, seal the flange,AberdeenPower transformer manufacturer, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.


Aberdeen15KVA control transformerInner and outer diameter size



Wiring mode of dry-type transformer:

Transformer manufacturers generally adopt IP20 protective casing which can avoid the entry of solid dirt with a diameter of more than 12mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure,AberdeenDistribution transformer video, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP23 protective casing can be adopted, which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow wind and sand.

Interpretation and observation.Power transformer manufacturer

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).


Aberdeen15KVA control transformerInner and outer diameter size



Operation of oil immersed transformer

Installation conditions.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well,AberdeenBox buried transformer, so as to achieve the pressure management of oil leakage.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Aberdeen.The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.