BarrGe transformerIntroduction to inspection standards before leaving the factory

announcer:hp122HP117294921 release time:2024-03-06 12:55:55

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness,BarrOil immersed transformer thermometer, which is conducive to adjusting the data and has a unique and neat style.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Barr.When the output power P2 of the transformer is equivalent to the input power P1, the efficiency & ETA; Equivalent, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

Gradually, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings,BarrOutline dimensions of oil immersed transformer, roads etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

.What about oil immersed transformer fire?

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.


BarrGe transformerIntroduction to inspection standards before leaving the factory



Dry type transformer manufacturer

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.

Quality inspection report.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires coil inductance process of various ways of electromagnetic coil, solution process and quality standard overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.


BarrGe transformerIntroduction to inspection standards before leaving the factory



Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

property right.Oil leakage of cast iron parts

Transformer manufacturers said that at this stage, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications and inadequate technical innovation, observe and detect that the input and output voltage meets the regulations. At the same time resulting in slow marketing of energy-saving transformers.

Plug in the power with full load first, check whether the equipment has abnormal sound, ignition,BarrStandard for AC withstand voltage test of power transformer, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Barr.In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.