BrandyTemperature standard for oil immersed transformersOperation taboos

announcer:hp122HP117294921 release time:2024-02-22 13:03:27

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

Brandy.Protection mode for type selection of dry-type test transformer

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness,BrandyOutdoor dry-type transformer structure, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

Wiring mode of dry-type transformer:

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.


BrandyTemperature standard for oil immersed transformersOperation taboos



Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

The step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change, cutting off the load current will cause arc burning between circuit breakers, tap power on and off or short circuit fault, so the dry-type transformer shall be powered off during regulation. Therefore, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation,Brandy50 kV box type transformer, the operation and maintenance management staff shall improve the safety inspection range of the transformer,BrandyOil immersed transformer bidding, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

Lets see.Oil leakage of cast iron parts

& ldquo; YN, D11 & rdquo;, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


BrandyTemperature standard for oil immersed transformersOperation taboos



(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

Project scope.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Two point grounding device of iron core caused by residual welding scar;

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

Brandy.What about oil immersed transformer fire?

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a warning sign shall be hung at a prominent position.