Chicako35kV energy saving power transformerMain performance parameters

announcer:hp122HP117294921 release time:2024-02-13 13:23:35

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation,ChicakoPower Bureau transformer, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Chicako.Precautions for trial operation of power transformer manufacturers

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Dry type transformer manufacturer

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.


Chicako35kV energy saving power transformerMain performance parameters



Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface,ChicakoBasket electric box transformer, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

Noise pollution control and prevention measures of dry-type transformer

market.Falling foreign matters and piercing

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

In the electric field of the winding to the yoke, there must be a strong line breaking component so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.


Chicako35kV energy saving power transformerMain performance parameters



Dry type transformer

The cost is reasonable.What is the reason for the shutdown of power transformer?

When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Protective measures for damping of dry-type transformer

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.