ElfasPrice list of transformer 3150kvaIndustry development opportunities and directions

announcer:hp122HP117294921 release time:2024-02-06 09:28:49

When the new oil filled by the power transformer and the oil sample that has just been considered are used the oil sample can be used only after sufficient standing.

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

Elfas.The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, dry-type transformers mostly use silica gel waterproof casing the class H dry-type transformer can be used.

Different diversion methods,ElfasQuotation for 2500kVA dry type transformer, while oil transformers mostly use porcelain waterproof casing;

.After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.


ElfasPrice list of transformer 3150kvaIndustry development opportunities and directions



The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,ElfasRated current of distribution transformer, the output capacity can be increased by 20%.

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.

Noise solution of dry-type transformer

Welcome to inquire.Power transformers are used in all walks of life

The voltage regulating tap changer is not in place or poor

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.


ElfasPrice list of transformer 3150kvaIndustry development opportunities and directions



(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Administration.When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak,Elfas33kV power transformer, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

Elfas.After no-load test run is normal for 24h, it can be transferred to on-load operation and the load shall be gradually increased from 25%, 50% and 75% by grade.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Careless maintenance and insulation damage