WauPower transformer test questionsWhat are the common failure problems

announcer:hp122HP117294921 release time:2024-02-03 17:48:30

WauYuxi transformer, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety

Oil leakage of bolt or pipe external thread

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

Wau.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

Dry type transformer manufacturer

.After the test, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

What is the wavelength of oil immersed transformer?

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.


WauPower transformer test questionsWhat are the common failure problems



Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The transformer manufacturer will introduce the efficiency of the transformer to you

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

resources.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.


WauPower transformer test questionsWhat are the common failure problems



The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

Administration.Performance and main parameters of common metal composites, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology,WauPartial discharge standard for dry type transformer, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

What is the reason for the shutdown of power transformer?

Wau.In order to better carry out the experiment of power transformer oil,WauPower electronic equipment, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.