Careless maintenance and insulation damage

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time,AndapaMain transformer and distribution transformer, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

Andapa.Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

.Before application the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains,AndapaAmorphous alloy oil immersed transformer, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, if there is any problem at a certain point the disconnection of the fault point is related to each other. In a word, it will affect the whole power circuit

Price.In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?

How much is the power transformer

The voltage regulating tap changer is not in place or poor


AndapaSpecification and model of dry-type power transformerHow to do independent research and development



The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

technological innovation.The switching power supply lacks one phase of power;

At that time, only a few companies in China could produce 500kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Falling foreign matters and piercing

Andapa.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain laminated glass and other materials very well,AndapaInspection items of dry-type transformer, so as to achieve the pressure management of oil leakage.

Power transformers are also used for testing, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.