MuyukaStructure of 35 kV oil immersed transformerHave other basic functions and characteristics

announcer:hp122HP117294921 release time:2024-01-22 11:48:00

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, chemical enterprises and factories.

Muyuka.Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

Dry type transformer

.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way,MuyukaWhat is a power transformer, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

Fault judgment of power transformer


MuyukaStructure of 35 kV oil immersed transformerHave other basic functions and characteristics



Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

The rate of transformer is: n = P2 / p1x1o%, that is, when the copper loss of transformer is equivalent to iron loss,MuyukaDry type transformer unit,MuyukaBox type transformer door, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

The cheapest.For no-load impulse closing of transformer, pay attention to the following matters:

The voltage regulating tap changer is not in place or poor

Noise dispersion of dry-type transformer


MuyukaStructure of 35 kV oil immersed transformerHave other basic functions and characteristics



Oil leakage of bolt or pipe external thread

Scheme customization.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor so as to further improve the stability of the temperature maintenance system software.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Muyuka.Oil immersed transformer company

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.