DenkodogoTransformer and currentWays to avoid damage

announcer:hp122HP117294921 release time:2024-01-21 12:42:02

Oil leakage of bolt or pipe external thread

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is,DenkodogoMarket analysis of dry type transformer, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Denkodogo.The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

.Dry type transformer company

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring,DenkodogoDistribution transformer capacity, and D (or D) is triangular wiring.


DenkodogoTransformer and currentWays to avoid damage



Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, please connect all routes as far as possible to prevent other faults.

Step up process of dry-type transformer?

Manufacturing process and steps of dry-type transformer

Inspection environment.Noise pollution control and prevention measures of dry-type transformer

High voltage fuse of transformer breaks one phase;

Sound in case of phase failure


DenkodogoTransformer and currentWays to avoid damage



The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV during the installation of lightning rod, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

market.Power transformer manufacturer

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and there are many principles.

Causes of fire in power transformer

Denkodogo.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube,DenkodogoStructural diagram of dry-type transformer, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.