SeksadTwo ton guide rail type cargo elevatorBroad prospects for development

announcer:hp779HP136589660 release time:2024-01-21 14:40:03

Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Corrosion prevention measures for the body of aerial work vehicles Attention to small scratches The paint surface of aerial work vehicles often corrodes. In addition to common collisions, scratches, and small rocks on the drive tire, there can also be a paint peeling point that can cause a small rust over time. Because most of these scars are small and easy to ignore. Therefore, regularly inspect the engine compartment lid and surrounding areas, and once found, go to a professional beauty shop for processing in a timely manner.

Seksad.'Before installing the elevator bearings, which can lead to premature bearing damage. In addition, when installing, it is necessary to ensure that the device environment is clean and not to bring iron filings, dust, and other things into the bearings, as even some small dust,', If it continues for a long time, it will also affect the running-in between bearings, leading to a decrease in the life of the elevator.

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.

.It should be noted that compared to some lifting platforms in certain venues, protective barriers are generally added to the platform. As lifting platforms belong to special equipment, the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when personnel ask if you need to add guardrails, do not blindly refuse, and consider whether it is necessary based on the site of use. 'In addition, it is necessary to possess two types of certificates, namely,Seksad1 ton lifting 8-meter cargo elevator, the Special Equipment Manufacturing License of the People's Republic of China and the Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China, installation and maintenance can be conducted. Therefore, it is necessary to ask the manufacturer whether they possess these two types of certificates.'.

It is good for aerial work vehicles not to cover their clothes and park outside. If it is windy and rainy, the clothes will repeatedly slap the car paint, especially if the vehicle blows sand on the clothes, causing many fine scratches on them, when the wind does not directly spray powder or clean the mechanism on the sand, it should be washed with water, and prevent the vacuum cleaner of the aerial work vehicle from scratching the sand particles on the paint surface.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.


SeksadTwo ton guide rail type cargo elevatorBroad prospects for development



To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box, the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Transportation lifting platforms need to be considered. However, in the use of elevators, some relatively large locations will purchase lifting platforms suitable for their own needs based on user requirements, which means that oversized equipment will have difficulties in transportation. This is also a concern for many users and manufacturers. The equipment is large in size and occupies a large area, making it difficult to move back and forth, and it is very difficult to move,SeksadHeavy industry guide rail type cargo elevator,SeksadSecond floor cargo elevator, So how should we solve it? Today, I will introduce to you in detail how large lifting platforms solve the problem of transportation difficulties.

Low cost: Compared to the scissor type mobile lifting platform, the cost is much lower. Therefore, when purchasing a lifting platform, it is necessary to consider the use range, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.

Quality documents.Test the goods elevator every day to see if it can operate normally.

After the goods are transported, clean the platform.

It is strictly prohibited for personnel to climb up and down the floors by using the goods elevator privately.


SeksadTwo ton guide rail type cargo elevatorBroad prospects for development



Does the cleanliness of the hydraulic station have relevant rules and requirements?

Equipment maintenance.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

Replace with new oil and do not intermittently use the old oil otherwise the moving parts in the system will accelerate wear.

Knowledge popularization and superior performance of scissor fork type fixed lifting platform: equipped with safety devices to prevent overloading of the lifting platform; Equipped with a protection valve to prevent hydraulic oil pipe from cracking; Equipped with an emergency lowering device for sudden power failure; The doors of the upper and lower floors are equipped with safety devices that interlock with the system.

Seksad.The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Nowadays, small and medium-sized enterprises are products with the idea of good quality and preferential prices.