Dongsheng3-meter cargo elevatorManagement System Research

announcer:hp779HP136589660 release time:2023-12-24 09:11:35

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type and iron plate sealed type.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Dongsheng.The manual hydraulic scissor type platform car has the following characteristics: suitable for long-distance transportation; Treadable feet and protective devices; Lightweight and easy to lift; Unique caster design ensures safety; The engineering handle design makes the operator comfortable to operate.

Large logistics warehousing equipment service company with guaranteed prices and guaranteed services, directly operated by the manufacturer. Because fixed elevators are mechanical equipment, the quality and performance of the product are good. Do not accept products from some manufacturers that do not meet the quality standards, in order to avoid some safety hazards in use.

.The load of this series of products is divided into 0.1 to 0.8 tons, and can also be customized according to user requirements,DongshengConstruction site personnel lifting cargo elevator,DongshengGuide rail lifting cargo elevator cargo elevator, with a load of up to 10 tons.

After the goods are transported, clean the platform.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.


Dongsheng3-meter cargo elevatorManagement System Research



Prepare the foundation according to the foundation plan, pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.

In fact, it is also important to pay attention to some details, as follows: It is actually difficult to pierce the bearings into the shaft pins when excessively installing them. However, sometimes, some people think of using a hammer to hammer the bearings to facilitate the installation, and use brute force during installation. In fact, directly striking the bearings with a hammer can cause significant damage to the bearings, which is the main reason for causing bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

The motor winding is short-circuited. When a short circuit fault occurs in the motor winding, the short circuit current is much larger than the normal working current, which increases the copper loss of the winding, causing the winding to overheat or even burn out.

Excellent service.After the goods are transported, install a separate distribution box. When using the distribution box, the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

What is the new price of fixed elevators? Fixed elevators are currently very popular in the market. Due to different manufacturers, different materials, different load ratings, and different brand awareness, the prices of fixed elevators produced in the domestic market are: rated load 1-5 tons, lifting height 7 meters, table size 2500 mm * 2000 mm, and the price is around 27000-45000 yuan; The rated load is 1-3 tons, the lifting height is 0 meters, the table size is 2300 mm * 2000 mm, and the price is around yuan. Rated load and lifting height of each fixed elevator,


Dongsheng3-meter cargo elevatorManagement System Research



Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Service first.In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft positioning boss, and to prevent unnecessary wear and tear.

Make sure to add butter twice a month to the transmission assembly where the grease fitting is located. For parts where butter cannot be added, it is necessary to dredge the oil circuit or replace the grease fitting until butter can be added, otherwise it is prohibited to use the equipment.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers and pull-out outriggers.

Dongsheng.Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data and the use of elevators and lifting platforms shall be checked

For guideway elevators installed outdoors, they are often exposed to rain and sunlight, so special attention should be paid to regular maintenance and inspection to avoid accidents.

Goods should be stacked well on the platform, and should not be tilted. When the goods elevator is lifting or lowering beyond the scope of the platform, no one should stand around to watch.