DenverHydraulic fixed boarding axleWhat are the maintenance methods?

announcer:hp161HP196399230 release time:2024-01-16 15:00:08

When working in foundation pits or depths a helmet must be worn.

Tighten the manual valve to close it.

Denver.The hook of the seat belt should not be hung on unstable or moving objects. Professional quality assurance from axle manufacturers. The promotional activities are ongoing, it should be checked in advance before use and new and old customers are welcome to come for consultation

To ensure that the hydraulic boarding bridge is in good condition,DenverRetractable boarding bridge, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty,DenverFolding boarding bridge, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


DenverHydraulic fixed boarding axleWhat are the maintenance methods?



Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, it should be considered whether there is built-in power

There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, and fixing device, and if the noise is caused by its vibration.

Service first.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope,DenverHydraulic boarding bridge factory, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, and foot of the slope, especially for the simple boarding bridge.


DenverHydraulic fixed boarding axleWhat are the maintenance methods?



When working in foundation pits or depths, a helmet must be worn.

Word of mouth recommendation.What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?

Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

The hydraulic boarding bridge not only reduces labor intensity but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

Denver.As we all know

During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

It is strictly prohibited to apply excessive pile loads around the foundation pit.