PalmaSmall electric loading elevatorBasic common sense

announcer:hp935HP175192871 release time:2024-01-15 09:50:32

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Palma.The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Equal effect.

Construction electric elevators outside the lightning protection range

reform.When the landing door is closed, the full width of the lifting passage opening should be covered.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


PalmaSmall electric loading elevatorBasic common sense



High lifting height, using side mounted oil cylinders, stable operation,PalmaHand propelled electric elevator, noise free, easy maintenance, and longer service life.

Welcome to inquire.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers)

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Palma.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods,Palma3 meter small electric elevator, the operating failure rate can be reduced to a low level.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, should comply with the provisions of Table 4 of GB 23821-2009.