Wei QiInsulation heat resistance grade of oil immersed transformerWhat is the defect processing method

announcer:hp122HP117294921 release time:2024-01-14 12:51:25

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Wei Qi.For oil transformer oil replenishment,Wei QiPower transformer price, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than 5%, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

.After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer and the vibration reduction solution is made at the cable bridge.


Wei QiInsulation heat resistance grade of oil immersed transformerWhat is the defect processing method



When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Transformer

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core,Wei QiPower transformer picture,Wei QiDistribution transformer, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Price.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

Method and process of taking oil sample of power transformer

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2% and then reduce the building structure noise transmitted by dry-type transformer oscillation.


Wei QiInsulation heat resistance grade of oil immersed transformerWhat is the defect processing method



Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

middleman.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

How is the quality level of dry-type transformer compared with foreign countries?

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Wei Qi.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.