Friend PHAE800 oil immersed transformerTeach you how to maintain

announcer:hp122HP117294921 release time:2024-01-14 11:41:43

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Friend PHAE.Several detection methods for installing transformer

What is the wiring mode of dry-type transformer?

.Connection group structure of dry-type transformer

Seal oil leakage

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


Friend PHAE800 oil immersed transformerTeach you how to maintain



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,Friend PHAEDetailed structural drawing of dry-type transformer, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Economic management.Method and process of taking oil sample of power transformer

What is the reason for the shutdown of power transformer?

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


Friend PHAE800 oil immersed transformerTeach you how to maintain



Noise pollution control and prevention measures of dry-type transformer

Product survey.If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%),Friend PHAEPrice list of power transformer, it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

Transformer

Oil leakage of bolt or pipe external thread

Friend PHAE.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube,Friend PHAEBox transformer recycler, carry out it twice, and then draw the oil sample.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.