dadElectric elevator mechanismCorrosion failure analysis

announcer:hp935HP175192871 release time:2024-01-13 10:26:35

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

dad.Precautions during operation: Mechanical operations should be gentle and smooth, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, it should be designed and calculated separately.

There is no need to set up a computer room above the shaft like an elevator etc.

When the wall bracket cannot meet the requirements of the construction site soft scenery, and the top floor height can be installed at least 2.5 meters.


dadElectric elevator mechanismCorrosion failure analysis



Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Unloading platform and attached electric construction platform, etc.

The net height of the landing door opening should not be less than 8m,dadMobile electric hydraulic elevator,dadSmall hydraulic electric elevator, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm the size of any through-hole and opening related to the distance between any door and adjacent moving parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Quality management.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm,dadElectric elevator, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.


dadElectric elevator mechanismCorrosion failure analysis



Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Good quality.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The stopper bearing of the mechanism is kept intact.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

dad.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The verticality of the guide rail frame should meet the requirements of the specifications.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.