Taibat ImamPower supply and distribution transformerCommon problems and solutions

announcer:hp122HP117294921 release time:2024-01-13 09:49:18

The key reason for oil leakage is that there are defects in cast iron parts

Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer,Taibat ImamProtection grade of oil immersed transformer, disconnect the switching power supply on each side quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Taibat Imam.This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Sound in case of phase failure

.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.


Taibat ImamPower supply and distribution transformerCommon problems and solutions



The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

Therefore, in the installation process of substation equipment,Taibat ImamTotally enclosed oil immersed transformer, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

Test conclusion.The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

Solenoid insulation deterioration

The method and whole process of taking oil sample of power transformer are as follows:


Taibat ImamPower supply and distribution transformerCommon problems and solutions



How much is the power transformer

Scheme customization.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

Taibat Imam.Some are tied with plastic tape,Taibat Imam10kV distribution transformer, and some immediately press the two edges together, and there is still oil leakage without sealing effect.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong so that the bolts are not tightened well, resulting in oil leakage.

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, so as to achieve the pressure management of oil leakage.