After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack and the lifting point shall be on the common earrings or bolts. If necessary,QingzhouWhat is the starting temperature of dry-type transformer fan, but we must pay attention to many problems in the whole process of applying power transformer.

Noise dispersion of dry-type transformer

.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating which is resistant to corrosion and rust,QingzhouDry type transformer Report, and has sound insulation and noise reduction.

Brief introduction of zero line of power transformer

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.


QingzhouS13-m-200 power transformerThe method of distinguishing inferiority



Fault judgment of power transformer

Several detection methods for installing transformer

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Word of mouth recommendation.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

Protective measures for damping of dry-type transformer


QingzhouS13-m-200 power transformerThe method of distinguishing inferiority



When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

middleman.The hanging core of dry-type transformer is a vital part

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Qingzhou.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time,QingzhouState Grid transformer, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?