QatarSpot inspection standard for dry type transformerHow to maintain 191029

announcer:hp122HP117294921 release time:2024-01-10 11:12:34

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage,QatarInsulation grade of oil immersed transformer, it shall be handled properly.

Qatar.Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,QatarOn load voltage regulating power transformer, the output capacity can be increased by 20%.

.Power transformer plant

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


QatarSpot inspection standard for dry type transformerHow to maintain 191029



Careless maintenance and insulation damage

What is the cause of power transformer core failure?

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

Excellent quality.High voltage fuse of transformer breaks one phase;

For the installation of lightning rod, power failure, damage to machinery and equipment, etc.

Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.


QatarSpot inspection standard for dry type transformerHow to maintain 191029



Power transformer manufacturer

how.Operation and maintenance management of oil immersed transformer

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Qatar.After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Power transformers are used in all walks of life

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,QatarInrush current of dry-type transformer, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.