ministerElectric lifting platform 2 metersIntroduction to the development history and application characteristics of

announcer:hp935HP175192871 release time:2023-12-30 13:16:41

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

minister.The occurrence of.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage,ministerElectric elevator lifting platform, or a hall.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

The quality of the standard section should comply with the product manual and specification requirements.


ministerElectric lifting platform 2 metersIntroduction to the development history and application characteristics of



The counterweight guide rail should meet the specification requirements.

Normal operation starts. Click on this free download of construction technical information. Safety limit devices should be installed on electric elevators for construction,ministerIndoor electric elevator, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Installation works.Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Chain type electric lifting mechanism: With a good guiding mechanism it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.


ministerElectric lifting platform 2 metersIntroduction to the development history and application characteristics of



The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

The cost is reasonable.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, it is necessary to do a good job in troubleshooting,ministerElectric pillar elevator, find the cause in a timely manner, reduce noise pollution, effective protective measures should be taken.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.