El PragueMobile lifting boarding bridgeWhat is the role of maintenance

announcer:hp161HP196399230 release time:2023-12-30 12:14:03

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

El Prague.Advantages: Simple operation structure, convenient operation, safety and reliability, beautiful appearance, making it a high-altitude work equipment with better safety and work efficiency.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use,El PragueMobile boarding bridge, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

.The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage,El PragueThe boarding bridge, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width which is the width of the channel.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems,El PragueMaintenance of boarding bridge, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.


El PragueMobile lifting boarding bridgeWhat is the role of maintenance



Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Features: Adopting a foldable arm (two section arm, three section arm), with a working height of 15-45 meters, Both the turntable and the work platform can be operated. The work platform can safely walk with the boom in any position, and the walking speed decreases with the rise of the lifting height. Set up the upper and lower platforms (ground platform and platform vehicle platform), and use directional switches to switch between the upper and lower platforms.

When working in foundation pits or depths, a helmet must be worn.

Analysis project.There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

conduct.


El PragueMobile lifting boarding bridgeWhat is the role of maintenance



The length of the electric hydraulic boarding bridge is generally about 10 meters, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Quality inspection report.Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

The product has a sturdy structure, a large load-bearing capacity, smooth lifting, simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will share with you some common knowledge about daily maintenance of outdoor elevators: When personnel enter the interior of the lifting platform for maintenance they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

The pressure on the axle will reduce the service life of the boarding axle.

El Prague.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

These are the options for hydraulic oil for mobile boarding bridges.

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge hoping to bring more help to everyone.