ChekhanovMobile hydraulic boarding bridgeDesign features

announcer:hp161HP196399230 release time:2023-12-30 11:46:10

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Chekhanov.Usage scenario: Widely applicable for installation, maintenance, and high-altitude work platform vehicles in industries such as municipal administration, electricity, streetlights, advertising, communication, photography, landscaping, transportation, docks, airports and ports and large industrial and mining enterprises.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

.What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil,ChekhanovFolding boarding bridge, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.


ChekhanovMobile hydraulic boarding bridgeDesign features



The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers,ChekhanovMobile boarding bridge, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

Tighten the manual valve to close it.

Test conclusion.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, and foot of the slope, especially for the simple boarding bridge.


ChekhanovMobile hydraulic boarding bridgeDesign features



Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Equipment maintenance.When replacing hydraulic oil, as well as noise when the pump station enters the air.

Regularly draining and refilling the oil tank to remove water and sediment is crucial for removing impurities in the oil, but regularly emptying the entire hydraulic system is also crucial. This is a reliable way to completely remove system impurities, oxidized hydraulic oil, and other harmful substances. Then, the recommended clean hydraulic oil should be added back to the system. If the oil is completely contaminated, the oil in the tank must be cleaned. The oil cleaning device allows the oil to flow until the oil pollution indicator shows that the oil is in a satisfactory state.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Chekhanov.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed,ChekhanovMobile Yard Ramps , but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.