Before installation the installation unit should confirm that the foundation, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Alexandria.The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station,AlexandriaElectric scissor type lifting platform, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

Horizontal lead screw mechanical electricity

.Then the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform,AlexandriaElevator electric small, and the lifting of goods should try to maintain a stable and uniform speed.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The quality of the standard section should comply with the product manual and specification requirements.


AlexandriaManned electric elevatorHow much do you know about



The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Sincere service.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The L distance depends on the selected wall mount model.


AlexandriaManned electric elevatorHow much do you know about



The landing door should meet the requirements of the specifications and achieve standardization.

Sales Department.Construction electric elevators outside the lightning protection range

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Alexandria.Acceptance: Concrete strength grade C30, strength testing report.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit,AlexandriaHand propelled electric elevator, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.