Busia100kg small elevatorDesign advantages

announcer:hp323HP155335083 release time:2023-12-26 12:15:40

it affects the speed. If the goods are too light, it also affects the normal transportation time.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Busia.Novice operators should pay attention to which equipment wears quickly when operating mobile elevators: Due to factors such as the processing and installation of high-altitude work platform equipment components such as mobile elevators, the equipment surface is rough, the area is small, and the load bearing is uneven, which can cause equipment wear. During the operation of high-altitude work platform equipment such as mobile elevators, the concave and convex parts on the surface of the parts are embedded and friction with each other, and metal debris undergoes secondary friction with the equipment which will accelerate the wear and tear of the surface of the equipment parts. Therefore, with a fast wear rate.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type and iron plate sealed type.

.Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

When the motor connection of the elevator is incorrect, when a coil, coil group, or one phase winding group is connected in reverse, it can cause serious three-phase current imbalance and cause the winding to overheat.


Busia100kg small elevatorDesign advantages



Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

There are three movable plates on both sides of the adjustment plate, which can effectively avoid accidentally injuring the toes of operators when the adjustment plate is lowered, ensuring the safety of equipment use.

Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

Excellent service.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test,BusiaA 4-meter elevator, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Emergency bolts not tightened; The solution is to tighten the emergency valve.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position,Busia15 meter mobile elevator, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged,BusiaFully automatic self-propelled elevator, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.


Busia100kg small elevatorDesign advantages



During the use of hydraulic elevators, if not properly operated, there will always be problems. Many customers have reported that hydraulic elevators sometimes cannot be lifted. If the hydraulic lift pump can continue to work, other issues need to be considered. Below, the editor will explain the reasons for the hydraulic lift pump station not being oiled and solve the reasons for the hydraulic lift pump station not being oiled, as well as the solutions for mobile elevators The analysis of the pump station of hydraulic elevators such as guide rail elevators is as follows: the motor power supply is abnormal or reversed; The solution is to correctly connect the motor power supply or adjust the steering mailbox to ensure there is no hydraulic oil or insufficient oil; The solution is to add hydraulic oil.

Direct material.Staying below high-altitude work sites is prohibited and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

Prepare the foundation according to the basic plan, pay attention to finding, leveling, and aligning points, and ensure the level of the foundation and various usage requirements.

Fixed boarding bridge: A fixed boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and batch goods inside the truck

Busia.1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe, sandpaper can be used to polish and remove the rust. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Drain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.