ChifengHydraulic fixed boarding bridgeMarket data statistics

announcer:hp161HP196399230 release time:2023-12-25 12:01:13

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Chifeng.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used for on-site vehicles without loading and unloading platforms or places that require mobile loading and unloading of goods. If there is no loading and unloading platform vehicle at the logistics site,ChifengBuy hydraulic boarding bridge, as a remedial measure, the mobile boarding bridge is incorrect

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time,ChifengManufacturer of boarding axle, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, strengthen dynamic management of equipment faults, monitor the status of key parts, establish a spare parts warehouse for vulnerable and commonly used parts,ChifengVehicle mounted boarding bridge, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel so that they can handle faults in a short period of time.

.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.


ChifengHydraulic fixed boarding bridgeMarket data statistics



Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

There are the following: (1) The brake of the elevator should be regularly inspected to see if its clearance is appropriate, as well as some other aspects, in order to ensure its flexibility and reliability in use. In addition, on the friction surface of the brake, it is necessary to check for any dirt, and if any, it should be cleaned in a timely manner. (2) For the part of the moving boarding bridge, it should be carried out in accordance with the specified requirements, the amount of oil should not be too much, as too much can also cause problems.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

Inspection requirements.It is strictly prohibited to apply excessive pile loads around the foundation pit.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.


ChifengHydraulic fixed boarding bridgeMarket data statistics



There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

property right.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure.

Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

Tighten the manual valve to close it.

Chifeng.During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, where are these noises caused? In fact, pump stations steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device, and if the noise is caused by its vibration.