the door may not meet the above requirements, but safety should be maintained.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Kemona.Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents personnel and property losses.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.


KemonaElectric banner elevatorIntroduction of several configuration forms



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Quality management.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Installation verticality deviation guide rail frame erection height,KemonaDC electric elevator, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down


KemonaElectric banner elevatorIntroduction of several configuration forms



Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

Application process.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,KemonaElectric elevator cargo elevator, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Kemona.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.