petalHow much is 500KVA box transformerFactors affecting productivity

announcer:hp122HP117294921 release time:2023-12-24 09:06:34

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

On load commissioning:

petal.This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Careless maintenance and insulation damage

.Noise solution of dry-type transformer

Power transformer

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation,petalTechnical parameters of scb12 dry type transformer, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer,petalDry type transformer scb14, causing the ignition of the casing, causing large-scale power failure, endangering all normal production manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


petalHow much is 500KVA box transformerFactors affecting productivity



The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Power saving analysis of transformer

What is the important role of power transformer

Quality management.The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions,petalDry type scb10 transformer, the Ministry of finance the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Manufacturing process and steps of dry-type transformer

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.