LanceMicro electric elevatorWhat are the benefits of coatings

announcer:hp935HP175192871 release time:2023-12-22 11:33:41

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Lance.Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


LanceMicro electric elevatorWhat are the benefits of coatings



Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

quality.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.


LanceMicro electric elevatorWhat are the benefits of coatings



Implementing multiple shifts of homework should fill in and submit records according to regulations.

investment.The quality of the standard section should comply with the product manual and specification requirements.

The shutdown device (emergency stop switch) should be non automatic reset type.

Installation verticality deviation guide rail frame erection height,LanceSelf propelled electric elevator, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators,LanceFire electric elevator, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Lance.To meet the needs of choreographers and choreographers in different plays,LanceElectric tricycle hydraulic elevator, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, using the low-speed descent of the lifting platform to represent a sunken ship in the sea using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door