arsenicElectric hydraulic elevator 15 metersProblems in processing

announcer:hp935HP175192871 release time:2023-12-21 12:30:20

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity,arsenicElectric high-altitude elevator, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies diesel engines, using Italian and domestic hydraulic pump stations, which have anti slip, insulation, and safety features. Please rest assured to use.

arsenic.Limit switches should be triggered directly by the movement of the suspension cage or its related components.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

.When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door,arsenic6-meter electric elevator, it worked normally.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear,arsenicFolding electric elevator, deformation, and corrosion of steel wire ropes


arsenicElectric hydraulic elevator 15 metersProblems in processing



Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

project.Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.


arsenicElectric hydraulic elevator 15 metersProblems in processing



With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Standard requirements.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Stop the suspension cage.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

arsenic.The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.