Sipakira10kV distribution transformerMarket status and future development trends

announcer:hp122HP117294921 release time:2023-12-20 12:06:56

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Sipakira.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.

Noise solution of dry-type transformer

.The flange surface is uneven,SipakiraDry type transformer technology, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


Sipakira10kV distribution transformerMarket status and future development trends



Before and after sampling and long-term scalding of iron core will lead to insulation aging.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, clean the periphery of the sampling port with clean or hairless linen.

How to make up oil for oil immersed transformer?

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

demand.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface,SipakiraTransformer distribution equipment, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Solenoid insulation deterioration


Sipakira10kV distribution transformerMarket status and future development trends



For example in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

Energy costs.The switching power supply lacks one phase of power;

A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

Noise pollution control and prevention measures of dry-type transformer

Sipakira.Power transformer manufacturer

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Performance and main parameters of common metal composites but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process,SipakiraTransformer oil immersed, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes machinery and equipment of each process flow; The natural working environment is basically regulated.