CartagenaCapacity specification of 10kV power transformerWholesale distribution

announcer:hp122HP117294921 release time:2023-12-20 10:27:56

Under normal conditions the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, and immediately communicate and contact with the on-site project staff in case of any problems the operation and maintenance management staff shall improve the safety inspection range of the transformer, so as to ensure the reliable and stable operation of machinery and equipment.

In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

Cartagena.Right, as & ldquo; Great Lars car & rdquo;, After replacing one 255kva small transformer, the utilization rate is close,CartagenaDirect transformer, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock,CartagenaPrice of box type transformer, and the phasor of the phase voltage of the secondary side is used as the second hand.

.Difference between dry-type transformer and oil immersed transformer:

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time,CartagenaLatest standard for dry type transformer, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


CartagenaCapacity specification of 10kV power transformerWholesale distribution



Connection group structure of dry-type transformer

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the transformer was disconnected by vibration (but there was no grounding device).

production.What is the important role of power transformer

How to reduce the failure of dry-type transformer?

Oil leakage of bolt or pipe external thread


CartagenaCapacity specification of 10kV power transformerWholesale distribution



If you want to check the activated carbon fiber for the hanging cover, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Process inspection.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.

There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

Cartagena.Deterioration damage of transformer core insulation

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).