The motor of the hydraulic guide rail lifting platform is set around the wellbore occupying a relatively small area, improving the utilization rate of the wellbore area.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Hyelia.Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

.It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


HyeliaScissor fork electric elevatorLife impact



Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than 40%

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

market price.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring,HyeliaElectric elevator lifting 10 meters, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.


HyeliaScissor fork electric elevatorLife impact



Implementing multiple shifts of homework should fill in and submit records according to regulations.

original.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, concealed engineering acceptance form, and concrete strength report.

The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Hyelia.Before installation the installation unit should confirm that the foundation, foundation bearing capacity,HyeliaElectric hydraulic elevator,HyeliaFully automatic elevator electric, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, and concrete strength report.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.