Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed,PalmaMultifunctional electric elevator, and then turn the transmission handwheel to lower the plug and achieve sealing.

Palma.The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, in order to meet the needs of the domestic market and the public efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

.Acceptance: Concrete strength grade C30, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking strength testing report.

The L distance depends on the selected wall mount model.

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset,PalmaElectric brick elevator on construction site, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.


Palma3 meter small electric elevatorYear-round sales



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Degrees, m/s.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Where is good.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

The quality of the standard section should comply with the product manual and specification requirements.

The use of standard section connecting bolts should comply with the user manual and specification requirements.


Palma3 meter small electric elevatorYear-round sales



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Administration.Protective measures should comply with regulatory requirements.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),

Once again, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Palma.There is no need to set up a computer room above the shaft like an elevator,PalmaElectric belt elevator, and the top floor height can be installed at least 2.5 meters.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.