Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, it shall be handled properly.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Esposender.Transformer

What is the wiring mode of dry-type transformer?

.& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock,EsposenderInstallation drawing of dry-type transformer, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Oil leakage of porcelain pot and laminated glass oil level gauge


EsposenderPower tubeIndustry specific uses



Oil leakage of bolt or pipe external thread

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

Dry type transformer company

Packaging strategy.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


EsposenderPower tubeIndustry specific uses



Before application, the sampling container shall be cleaned with vehicle gasoline soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Installation material list.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

At that time, only a few companies in China could produce 500kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod,EsposenderHigh efficiency and energy saving power transformer, please connect all routes as far as possible to prevent other faults.

Esposender.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing,Esposender4000kva dry type transformer, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Method and process of taking oil sample of power transformer

Wiring mode of dry-type transformer: