TruvaHydraulic lifting platform for loadingHonest service

announcer:hp530HP141750488 release time:2024-09-08 16:14:45

Lifting mechanism: The workbench should be ensured to rise and fall smoothly, and there should be no jumping lifting phenomenon. All moving parts should be flexible when moving, and there should be no jamming devices. The lifting system of the elevator is divided into electric or manual hydraulic systems, and there should be no leakage at all components, pipelines, and joints.

When installing, disassembling, and adjusting the rotating mechanism, attention should be paid to ensuring that the middle line is parallel to the middle line of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable for the brakes of each mechanism. The clearance between the brake wheels should be regularly checked and adjusted to ensure its flexibility and reliability. There must be no dirt on the friction surface and it must be cleaned with gasoline or diluent.

Truva.When working at heights, except for relevant personnel, no one is allowed to walk or stay below the workplace. Fencing or other protective devices should be installed below the workplace to prevent falling objects from injuring people.

Ensure that there is a suitable power supply at the installation site,Truvafork lifter, and separate maintenance of the distribution box is required. The distribution box should have a leakage switch, and the hydraulic cargo elevator construction site should be equipped with a fire extinguisher to prevent welding operations from causing fires. When selecting a leakage switch it should be suitable for the operating power.

.When the hydraulic oil of the equipment is insufficient,Truva3-meter hydraulic lifting platform, it will not cause lifting. At this point, you only need to add enough hydraulic oil to run.

Pre install equipment, maintain unobstructed access roads and sufficient parking space before pre installation. Some hydraulic cargo elevators require heavy lifting assistance for installation, some require equipment such as forklifts for installation, and some can be pre installed manually. When it is necessary to install with the assistance of a truck crane and a forklift, full consideration should be given to whether the on-site environment meets the working conditions of the truck crane.

Aluminum alloy elevators are different from other forms. This type of elevator is made of aluminum alloy material, which is lightweight and has a more beautiful appearance. The disadvantage is that it has a light load capacity and is only suitable for simple high-altitude maintenance work, and can only provide support for 1-2 people.


TruvaHydraulic lifting platform for loadingHonest service



Therefore, the wholesale manufacturers of hydraulic elevators remind that there are three main ways to adjust the speed control circuit: throttling speed control circuit: quantitative pump oil supply, using flow valves to adjust the flow in and out of the actuator to achieve speed control; In the volume throttling speed control circuit, the oil is supplied by the pressure limiting variable pump, and the flow rate into the actuator is adjusted by the flow valve to adapt the flow rate of the variable pump to the regulated flow rate of the speed control valve.

There are two installation methods for hydraulic freight elevator oil cylinders: jacking and lifting. The difference between jacking and lifting is that the placement direction of the oil cylinder is opposite, which is a qualitative problem and easy to arrange. The disadvantage is that the effective use of the oil cylinder can lift the same load, and the oil cylinder of the lifting mechanism is much larger than that of the lifting mechanism. Professional elevator manufacturers and other special products, with price advantages and guaranteed quality

When placing materials on the platform, they should be placed in the middle of the platform as much as possible. The weight of the goods should be within the standard load range of the equipment, and the volume of the goods should not exceed the platform size of the equipment. Otherwise, materials and lifting platforms may be injured and dangerous accidents may occur. High priced and various specifications of elevator manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

Discount. Road noise can also occur if tires are crushed against objects that are prone to noise. The shaking amplitude of the scissor type lifting platform is proportional to its lifting height. The higher the height, the greater the shaking. When using it at a working height of 10 meters, if possible, please use safety protection measures

The lifting platform is placed on a horizontal support surface, each load-bearing component must not have deformation or cracks.

The lifting platform is placed on a horizontal support surface, and the concentrated load of MAX load capacity is placed at any position 300mm away from the periphery of the workbench. After lifting 100 times, each load-bearing component must not have deformation or cracks.


TruvaHydraulic lifting platform for loadingHonest service



When installing, disassembling, and adjusting the rotating mechanism, attention should be paid to ensuring that the middle line is parallel to the middle line of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable for the brakes of each mechanism. The clearance between the brake wheels should be regularly checked and adjusted to ensure its flexibility and reliability. There must be no dirt on the friction surface and it must be cleaned with gasoline or diluent.

Work courses.The speed circuit is the circuit that switches the motion speed and speed of the actuator in the hydraulic system of the guide rail hydraulic lifting platform. Mainly including valves, pumps, and actuators. The commonly used speed circuits include speed circuits, and speed switching circuits.

Advantages of geotechnical engineering: There is no need for a computer room above the shaft, and the top floor height can reach over 5 meters.

Check valve leakage: If the natural wear of the check valve exceeds the specified value after long-term use, it will cause leakage. Disassemble and clean the check valve and replace it if necessary.

Truva.Mobile is a type of cargo heavy machinery equipment with good adjustment reliability and wide application fields, suitable for automated production lines

Surface paint quality: The paint should be smooth and flat, have good adhesion with metal have uniform color, no bubbles, no cracks, and there should be no wrinkles, paint leakage, and sagging.

Volume speed control circuit: Speed control is achieved by adjusting the displacement of a variable pump or variable motor.